Institute of Electrical & Electronic Incorporated Engineers (1978)
Associate Member of the Chartered Institute of Building Services Engineers
(1989)
Jeff has vast experience of design, project and commercial management
of, and commissioning of small, medium and large environmental health
projects. As such he is a most useful asset for any client whether they
be developers, main contractors or subcontractors.
Managing development of services sector client base. Has been involved
in many specific commissions including the preparation of an M&E case
study for a main contractor in dispute with client, and acting as loss
adjuster's expert on services related insurance claims. Also acting as
environmental health lead designer on several projects.
2001 : Building Services Manager / QS currently managing a new multi-storey
office project in inner London partnering with the Client to procure M&E
services, lifts and statutory services.
2000 - 2001 : Tendering of several large projects with main M&E contractors
and consultants including technical appraisal of schemes, costing and
programming.
1999 - 2000 : Building Services Manager on fast track superstore valued
at £6 million, completed in 17 weeks.
1996 - 1999 : Building Services Manager / QS on Virgin Atlantic Airways
head office valued at £26 million final account. Managing services
installation. Also involved in preparation of extension of time, loss
and expense, final accounts and insurance claims.
Electrical Contracts Manager responsible for medium size projects from
concept to completion. Projects included the London Clinic, Harley Street,
IT installations at Inland Revenue tax office and Heathrow Airport Terminal
2.
Electrical Contracts Manager responsible for engineering and management
of electrical installations for 51 buildings in Al Kharj Air Base, Saudi
Arabia. Continuation of four other projects to American Standards completed
in the Middle East with French and UK contractors. These buildings mainly
comprised of aircraft repair and testing hangers.
Completed three major projects from conception to completion as well as
being involved in tendering. Projects comprised the mechanical and electrical
installation at the Ipswich Buttermarket (£7 million), the Exchange,
Illford, being a £3.5 million electrical project and the International
Stock Exchange, being a six month fit out worth £1.8 million.
Senior Electrical Engineer on overseas projects in Egypt with European
consultants and contractors. Of particular note was the MISR Bank, Cairo
project comprising a 27 floor banking complex and office block. Jeff was
responsible for all aspects of installation, drawings, testing and commissioning.
Following completion of the bank, Jeff project and commercially managed
the 300 bedroom Pyramid Hospital at Giza.
Consultant's design engineer on various projects including a water tower,
diplomatic quarters and a naval base in Riyadh. Also working on special
assignments for Balfour Kilpatrick in Jeddah and Qatar.
Design and Contracts Engineer involved in estimating, engineering and
procurement on many prestigious overseas assignments including the Jebel
Ali Hotel in Dubai, the Kama Sports Stadium, the Jabali power distribution
scheme, Jordan potash terminal, petrochemical fuel facilities project
in King Khalid's military city, Saudi Arabia and the Ace housing project
in Jeddah.
Design draughtsman working on the Ko-ri Atomic Power Station in South
Korea with all switchgear supplied by GEC in UK. Six months were spent
working on substation design for heavy power systems.
Served an apprenticeship in Engineering Drawing for Electrical Services.
This included working on site as an apprentice electrician at the London
Stock Exchange and Sun Alliance Building. Other projects, which helped
with promotion to Assistant Engineer, were: Berkeley Hotel, George Street
Hotel and Euston Tower and NCP car park.
|
 |
 |